- Location: Grand Island, NE
- NCompleted: May 2014
- Owner: Gloria Thesenvitz
- Type of Build: Design-Build
- Project Schedule: 2 Phases, Spanning 3 Years
- Project Size: 55,000 sq. ft.
Project Overview
Chief Construction has worked with Nova-Tech on two different phases of builds. The first phase included the build-out of the 33,000 square foot temperature-controlled warehouse and was completed in August of 2015. The new warehouse has undergone temperature control mapping and testing to ensure that the environment is ideal for storage. Phase two included a 22,000 square foot facility that is now home to additional manufacturing lines. This space required precision in every aspect of the build. The facility is designed and operates under Current Good Manufacturing Practice (CGMP) standards to ensure all clean/sterile standards are met.